Authorities

Name:O.C.G. § 46-3-50 et seq.

Summary

The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year.

Interconnected customers must comply with all relevant national standards, including those established by the Institute of Electrical and Electronic Engineers (IEEE), Underwriters Laboratories (UL), and the National Electrical Safety Code (NEC). Furthermore, the Georgia Public Service Commission (PSC) may adopt additional safety, power-quality and interconnection requirements. There is no provision in Georgia's interconnection standards requiring customers to install a manual external disconnect device. Utilities may not require additional tests or additional liability insurance.

Check your utility's website for further interconnection rules. Southern Company’s Distribution Interconnection Pollicy is found here.

Solar system price checker

Design Your Solar Home

START

Market Trend

12 3

Input your address to see if it is solar friendly and how much you can save with solar.

Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.

Whoa ! Going solar is definitely a smart decision.

kw System size years Payback period Lifetime savings

No money down, 100% finance is available.