Solar panel installation is the last step

Julian HawkinsJuly 25, 2018 655 0

Solar panel installation is the last step

A solar panel installation is an interesting event for every homeowner who desires to go solar barring it is they will install racking to support your panels (this is the only piece of equipment that will actually be attached to your roof). Once the racking is level and safely attached, the panels are placed on the racking. a final part of a method.

Your solar installer will commence by prepping your roof and making sure the shingles or tiles are properly fastened. Then, they put in electrical wiring that will connect to your electrical panel and general power solar powered lsnsystem.

They will install racking to support your solar panels (this is the only piece of material that will really be connected to your roof). Once the racking is level and securely attached, the solar panels are placed on the racking. After the electrical wiring is arranged. Conclusively, your inverter or inverters are joined to the solar panels to convert direct current (DC) energy into the alternating current (AC) energy used in homes and on the electric grid.

The timeline for the installation

If your installer needs to add a power meter, this will add a few hours to your solar panel installation.
The timeline for the installation will range from one to three days, ultimately reliant on the size of the system you are installing. One additional factor that can add time to your installation process is putting in a power meter for net metering.

Solar panel consent 

The last step of going solar is “turning the switch on” so to address, and properly initiating to produce strength from your rooftop. Before you can unite your solar panels to the electric grid, a representative from your town government will need to inspect the system and give approval. During this inspection, the representative will essentially be double-checking your installer’s work.

He or she will verify that the electrical wiring was done correctly, the mounting was safely and sturdily attached, and the overall install meets standard electrical and roof setback codes.

Following this bounded investigation, you will be ready for approved grid interconnection. A delegate from your electric company will come by to do their own closing evaluation of the solar panel system. As long as there are no glaring issues, your panels will go live the moment they accept and connect your system to the grid. You can expect to wait two weeks to a month for the town permission and utility endorsement to occur and interconnection to go live.

If you want to move into the future and join the solar revolution, or if you want to find out what solar panels are right for you, go to HahaSmart.com and try our price checker tool. You can see how much a system will cost, and how much you can save over the next 20 years.

For more information relating to going solar, don't forget to visit our solar blog section for more handy guides and articles.

Solar system price checker

Comments

Design Your Solar Home

START

12 3

Input your address to see if it is solar friendly and how much you can save with solar.

Great. Your address is perfect for solar. Solar incentive is still available. Select monthly utility cost and calculate the size of solar system you will need now.

Whoa ! Going solar is definitely a smart decision.

kw System size years Payback period Lifetime savings

No money down, 100% finance is available.

Looking for certified solar installers? Sign up now and we will find them for you.

Do not show this information again.